75th Anniversary
Up Frequent Questions GNRHS Staff Reference Sheets Modeling Conventions Research & Archives Links GNRHS Store What's New? Contact GNRHS

 

Home

The Empire Builder
75th Anniversary
June 11, 2004


Empire Builder Timeline:

1929

On June 11, six new consists of luxurious, heavyweight equipment began service as Great Northern's premier passenger train, the Empire Builder. Named for GN's founder, James J. Hill, these Chicago to Seattle trains operated on a 63 hour schedule westbound (Train #1) and 61 hour, 15 minute schedule eastbound (Train #2). 

The train took advantage of significant route improvements in the 
Cascade Mountains. These included the new 7.8 mile long Cascade Tunnel 
and the Chumstick Valley line change. 

Motive power was either a P2 class 4-8-2 or S2 class 4-8-4 steam locomotive. Between Skykomish and Wenatchee, electrics handled the consist. These trains were the last word in comfort, amenities and speed for their day. Punctuating the train was the last car, an 89' buffet-lounge-solarium-observation with a sun room replacing the 
traditional open platform.

Empire Builder ran between the Pacific Northwest and St. Paul
on the Great Northern and on the Burlington Route between
St. Paul and Chicago.

Then, as now, the train split at Spokane with a section going to 
Seattle and Portland. 

1931

With the advent of the depression, the Empire Builder was rerouted and 
given a slightly faster running time of 58 hours 45 minutes westbound 
and 56 hours, 25 minutes eastbound. Its companion train, the Oriental
Limited was discontinued on March 29.

1935

Air Conditioning was introduced on the Empire Builder.

1937

58 seat, semi-streamlined luxury coaches are added to the train.

1942

With the United States' entry into World War II, the Empire Builder
began running in sections to handle the increased passenger traffic.

First #1 and First #2 were the sleepers.
Second #1 and Second #2 were the coaches.
Any additional sections were generally troop trains or "Mains".

Glacier Park closed for the duration of the war.

1943

Burlington Route and Great Northern jointly order new streamlined
Empire Builder consists.

1945

Between April and June, pairs of E7A diesel passenger locomotives arrive
from EMD. These would be initial power for the postwar Empire Builder.

1946

Glacier Park reopens.

1947

February 23 saw the inauguration of the postwar edition of the 
Empire Builder
. These five consists of 12 streamlined cars each were 
built by Pullman. The trains were given a 45 hour schedule between
Chicago and Seattle.

These trains were decked out from E unit to River series observation 
car in an eye-popping Omaha Orange, Pullman Green and gold stripe
paint scheme. What came to be known as the "Empire Builder scheme"
became the standard for GN passenger trains for the next 20 years.

1950

E7 diesel passenger locomotives experience overheating problems
in the mountains. They are replaced by an A-B-A set of EMD
F units (F3's and F7's). Great Northern modified these units
into "Passenger F's" with higher gearing for greater speed and
boilers for steam heat.

1951

Great Northern stuns the railroad industry and completely re-equips the
Empire Builder. In a joint order with Pullman and American Car
& Foundry, GN inaugurates 5 all new 15 car consists. These
became known as the "Mid-Century Empire Builder".

This edition of the Builder introduces the tall-windowed Mountain Series
observation cars and famous "Ranch Cars", a western-themed lounge car
featuring the G Bar N brand as its trademark. Meant to emulate a
western chuck wagon (complete with pinto leather seats and huge coffee
pot), these quickly become the most popular car on the train.

On June 3, the "Oriental Limited" name is retired and replaced with
the name "Western Star". This train uses the equipment from the
original 1947 postwar Empire Builder. The Western Star makes all 
the summer season stops in Glacier Park that the Empire Builder skips.

1955

May 29 sees the introduction of Budd-built "short" domes, 3 to a train
consist. Also from Budd comes full-length dome lounges for first-class
passengers which arrive in October. All called "Great Domes" by the
Great Northern, the 3 shorts and 1 full dome per train provided a
whopping 150 dome seats for Builder passengers.

The 1955 edition of the Empire Builder represents the zenith of the
the train's evolution on the GN. To pull the heavier consist, GN
now assigns 4 EMD F units (Passenger F's) arranged in A-B-B-A fashion.

CLICK HERE for a more detailed look at this version of the Empire Builder.

Timekeeping is reduced to 43 hours, 50 minutes westbound and 44 hours,
30 minutes eastbound.

Former River series Observation cars (from the 1947 Postwar Empire
Builder) are remodeled into Coulee Series observations with additional
sleeper accommodations. The Mountain Series observations move over to
the Western Star.

1956

On April 29, the Empire Builder is given the train numbers #31 and #32.

July 31 sees the end of the Cascade electrification and for the first
time, the Empire Builder operates Chicago to Seattle straight through
under diesel power.

1960

In February, the Coulee Series observations are removed during the
winter season.

1962

The "simplified scheme" appears on the Empire Builder's Passenger Fs
(as well as future orders for freight engines). Designed to save
a day's time painting, it features orange on top, green on the bottom
and no gold stripes. Passenger cars retain the traditional
orange/green/gold stripe EB scheme.

1966

Though combined with the Afternoon Zephyr (westbound) and 
North Coast Limited (eastbound) between Chicago and St. Paul 
on CB&Q in previous years, the fall of 1966 sees the the 
Empire Builder combined with the North Coast Limited on a 
regular basis until Amtrak day 1971. 

Since the Empire Builder and North Coast Limited were already 
combined on SP&S between Pasco and Portland (and had been 
since 1952), the Empire Builder is slowed some 90 minutes 
between St. Paul and Portland to match the slower running 
time of the North Coast Limited to allow consolidations 
at St. Paul and Pasco.

1967

May 11 is the beginning of the "Big Sky Blue" era. Passenger
equipment begins to receive the blue, gray and white paint
scheme replacing the traditional EB scheme.

Coulee Series observation cars are permanently removed from
the Empire Builder (and are later rebuilt into coaches).

More powerful SDP40 (1966) and SDP45 passenger locomotives
are received from EMD to replace the tired Passenger Fs.

In the fall, all RPOs (Railway Post Office) cars are 
terminated by the Post Office. This is a tremendous loss
of revenue for the Empire Builder.

1968

The Empire Builder begins stopping at the summer season
stops in Glacier Park (East Glacier and Belton). The Builder
also assumes operation of the tourist sleeping cars to 
Glacier Park, that previously were handled by the Western Star.

Experimental Cascade Green paint schemes begin to appear
on some GN passenger equipment (a harbinger of the upcoming
BN merger).

1970

On March 2, four railroads merge into the Burlington Northern:
Great Northern, Northern Pacific, SP&S and Burlington. BN
takes over operation of the Empire Builder.

1971

May 1 is the start of Amtrak which begins to operate most U.S.
passenger train service. The lone Chicago-Seattle passenger 
train is the Empire Builder, but it is routed between Chicago 
and St. Paul via the Milwaukee Road. West of St. Paul, the 
pre-Amtrak route is used to Fargo and from Minot to Sandpoint. 

Between Fargo and Minot, the train operates via Grand Forks 
instead of New Rockford. Between Sandpoint and Seattle, 
the former Northern Pacific line via Pasco and Yakima is used. 

The Portland-Spokane section of the Builder is terminated. 

Amtrak discontinues service to St. Paul Union Depot and 
makes its only Twin Cities stop the former Great Northern 
station in Minneapolis.

The ex-GN portion is now the Twin Cities to Sandpoint, Idaho.

1977

September: Because of a shortage of operable aging equipment, 
the frequency of the Empire Builder is reduced from daily 
to four days per week. 

1978

March 1: The Empire Builder begins serving the new "Midway" 
station in St. Paul, Minnesota, and all passenger service 
ends at the former Great Northern Station in Minneapolis, 
which had been used by the Empire Builder.

Along with three-day-per-week service from the North Coast 
Hiawatha (Amtrak service added starting on June 5, 1971) 
running on mostly a former NP routing (but on the pre-Amtrak 
Empire Builder route between Spokane and Seattle), this 
provides one daily Chicago to Seattle train across 
the Northern Plains.

1979

October 1: The North Coast Hiawatha and several other Amtrak 
trains are discontinued in a major downsizing of the long 
distance Amtrak system. The frequency of the Empire Builder 
is further reduced to just three days per week (its all-time low). 

The train is rerouted off its ex-GN route between the 
Twin Cities and Moorhead, MN to an ex-GN/NP route between 
the Twin Cities and St. Cloud, and ex-NP route between 
St. Cloud and Moorhead (Fargo).

The ex-GN portion of the route is now the Twin Cities to 
Sauk Rapids (St. Cloud) and Moorhead, MN (Fargo, ND) to 
Sandpoint, Idaho.

October 28: The Empire Builder becomes the first 
long-distance train to be given the new bi-level Superliner 
equipment. At this time, the Superliner lounge cars have 
yet to be placed into service and the train runs with as few 
as two coaches, a diner, and one sleeping car on a tri-weekly 
schedule; certainly, the lowest point of available 
passenger-carrying capacity.

1981

Owing to a desire by Burlington Northern to downgrade the 
former NP main line between Pasco and Auburn in Washington 
State, the Empire Builder resumes its pre-Amtrak and ex-GN 
routing between Spokane and Seattle via Wenatchee, and for 
the first time as an Amtrak train, receives a Portland section 
from Spokane via Pasco and Wishram. 

The faster routing on the former GN between Spokane and Seattle 
allows a major schedule change, that with the new Portland 
section, provides much improved connections to other Amtrak 
trains in Chicago and Portland.

The ex-GN portion of the Empire Builder route is now 
Twin Cities to Sauk Rapids, MN; Moorhead, MN to Sandpoint, ID, 
and Spokane to Seattle.

1982

The Empire Builder (operating tri-weekly since 1979) begins 
a seasonal daily operation over the Christmas 1981 and New 
Year's 1982 holiday period, but in January 1982, Amtrak announces 
that the train will not revert to a tri-weekly operation 
and will remain daily. 

Reasons for the upgrade in service were given as good patronage 
(helped by the new routing and Portland section implemented 
just a couple months before), and influence by Senator Mark 
Andrews of North Dakota, Chairman of the Senate Appropriations 
Committee.

Amtrak builds a new station in Grand Forks, North Dakota that 
eliminates the need for the Empire Builder to head into the 
station from a junction west of downtown and then back out 
before preceding. Actually, this backup move had been eliminated 
some months earlier with the train stopping in "West Grand Forks" 
(at the wye) and passengers bused to the ex-GN/Amtrak station downtown.

1995

Citing a budget crunch, and in a move reminiscent of 1977, 
Amtrak reduces the frequency of the Empire Builder on February 1 
from daily to four times per week west of St. Paul. Daily service 
continues to be provided between the endpoints of Chicago and Seattle. 

On the days that the Empire Builder does not operate, the Pioneer 
(started by Amtrak in 1977) runs on its tri-weekly schedule via 
Omaha, Denver, Laramie, and Boise (more or less on the 
ex-UP City of Portland route).

1996

Empire Builder Interpretive Guides program is started on
the train sponsored by GNRHS through the 2000 season.
These guides ride the Builder from Edmonds to Shelby
and inform passengers about the local history, flora, 
fauna, and geology of the regions they are passing through.

1997

Citing a continued shortfall of operating funds and a need to cut 
back, Amtrak announces the discontinuance of tri-weekly Chicago 
to Seattle Pioneer as well as other trains. 

With the equipment freed from these trains, Amtrak restores 
the Empire Builder to a daily operation over the entire route. 
The Empire Builder again becomes the sole remaining 
Chicago-to-Seattle/Portland passenger train.

2001

National Park Service's Trails and Rails partnership with Amtrak
takes over Empire Builder Interpretive Guides program.

2004

Empire Builder celebrates its 75th Anniversary, June 11.

Bibliography:

GNRHS Reference Sheets #178, #190, #209, #227, #244 
all authored by GNRHS member Dr. John F. Strauss, Jr., 
a former Empire Builder Traveling Passenger Representative 
for the Great Northern Railway.

Additional sources: Passenger Train Journal, Trains Magazine, 
"All Aboard Amtrak" by Mike Schafer, "James J. Hill", by Michael P. Malone

Various Amtrak timetables 1971-2004.